Utility Services

  • Pole setting roadside & off-road
  • Primary line extensions
  • Pole line construction
  • Medium voltage cable laying (Roadside & Offroad)
  • Medium voltage cable installation and terminations
  • Substation repair/maintenance
  • Medium voltage cable testing
  • 15 KV megger
  • 34.5 KV VLF
  • Tan/Delta
  • Medium voltage fault detection (Thumper)
  • Crane service
  • Drone IR Scanning
  • Solar Field Curve Trace testing
  • Fiber optic installation
  • Fusion Splicing
  • OTDR Testing
  • Strand & Lash installation
  • Bentonite pumping



2015
Bingham Wind Project

Underground MV collector system & underground Fiber Network

















HOVER MOUSE OVER VIDEO

TO WATCH COMPLETE VIDEO

2017
Deer Field Wind

Underground MV collector system & underground Fiber Network, Substation
















HOVER MOUSE OVER VIDEO

TO WATCH COMPLETE VIDEO
















HOVER MOUSE OVER VIDEO

TO WATCH COMPLETE VIDEO

2019
Deer Isle Bridge

New Paragraph



2021
Rox Wind

Underground MV collector system & underground Fiber Network, Substation
















HOVER MOUSE OVER VIDEO

TO WATCH COMPLETE VIDEO

2022
Pelletier Solar - Fort Kent

Utility Scale Solar Project


New Paragraph

OUR PAST PROJECTS


2006-Evergreen Wind Project
Mars Hill, Maine

Scope of work:  34.5 KV Underground Collector.


2008-Stetson I Wind Project
Danforth, Maine

Scope of work: 34.5 KV Underground Collector.


2010-Cary Mills Substation Construction
Houlton, Maine

Scope of work:  Steel erection, Buss installation, cabling, setting of transformers and breakers, all connections.

 

2012-Bull Hill Wind Project & Substation
Eastbrook, Maine

Scope of work: Underground 34.5 KV Collector, substation grounding, component installation, 34.5 and 115 KV buss installation, cabling, control house buildout, all connections.

 

2013-Union Street Substation Rebuild
Portland, Maine

Scope of work:  Substation grounding, Underground Duct banks and cabling, new control house install and wiring, new switchgear and cabling install and connections, Pfisterer connections on new and existing transformers.

 

2014-Saddleback Wind Project
Dixfield, Maine

Scope of work:  34.5 KV Underground Collector and assist at new substation.

 

2014-Keene Road Substation
Chester, Maine

Scope of work:  Substation grounding, underground conduit and cables, new control house, 115 and 345 KV buss installation, component setting, overhead cabling and all connections.

 

2015-Oakfield Wind Project
Oakfield, Maine

Scope of work:  34.5 KV underground collector cabling and assist at new substation.

 

2015-Bingham Wind Project
Bingham, Maine

Scope of work:  34.5 KV underground collector and assist at new substation.

 

2016-Hancock Wind Project
Spectacle Pond Ridge, Maine

Scope of work:  34.5 KV underground collector, 34.5 KV Overhead collector and assist in substation buildout.

 

2016-Work Done For Emera
Bar Harbor, Maine

Scope Of Work: Pfistere Connections & Testing at New Substation


2017-Deerfield Wind Project
Searsburg, Vermont

Scope of work: 34.5 KV underground collector, switchgear install in towers, soft and hard bus install in substation.

 

2019-Deer Isle Bridge

Scope of work: Pull new 15 KV cable thru existing conduits across bridge and up riser poles at both ends. Perform splices on bridge and riser pole connections.

 

2021-Rox Wind Project

Roxbury, Maine

Scope of work: 34.5 underground collector, 34.5 Overhead Hendrix collector off road,

SCADA building and MET tower wiring.

 

2021-Millinocket WWTF Upgrade

Millinocket, Maine

Scope of work: Change pad mount transformer and underground cable and connections to upgrade voltage to 12470 primary. Install Pfisterer terminations at substation.

2021-Solar Project
Brunswick, Maine

Scope of work: Install short 15KV overhead line extension and underground cable to transformers.


2022-Daigle Solar Project for Borrego
Fort Kent, Maine

 

2022-Pelletier Solar Project for Borrego
Fort Kent, Maine